Kizildere III - Turkey

Combined-cycle geothermal power plant 95 MW

  russia

Kizildere III Project Abstract

Toshiba Corporation (TOKYO: 6502) has won a major order to supply a flash steam turbine system and generator for the Kizildere III Geothermal Power Plant in Turkey. Zorlu Energy, an independent power producer and member of Turkey’s Zorlu Energy Group, will construct the plant in Kizildere, in the Aydin province of West Anatolia, Turkey, approximately 150 km from the Aegean Sea and Toshiba will deliver the generation equipment in December this year. Kizildere III is a major project, a 95MW, high-efficiency triple flash combined-cycle geothermal power plant, one of the largest built in Europe and the Middle East. The plant will integrate two systems: 72MW flash steam generation system that uses steam under high pressure; plus an approximately 23MW binary cycle power generation system that uses flash turbine exhaust steam to vaporize a working fluid with a lower boiling point and use it to drive a turbine. Toshiba will supply the flash steam turbine generator system, and the binary system will be supplied by US-based Ormat Technologies, Inc., who is also Toshiba’s partner in other geothermal projects under a strategic collaboration agreement (SCA) signed last October.

Flenco’s presence in the Project

Flenco is pleased to have been selected as preferred partner by Toshiba (via Moritani Gmbh) to supply its auxiliary systems for this project. For further inquiries about this collaboration, you can ask your usual contact person at our Sales Department or complete and send us our contact form.

Source: www3.toshiba.co.jp

main projects