Samra IV - Jordan

Combined-cycle power plant

  russia

Samra IV Project Abstract

Doosan Škoda Power won another project in the Hashemite Kingdom of Jordan in the second half of 2016. It is the fourth stage of construction of the Samra combined cycle power plant under which the existing gas cycle will be extended by a steam section. Doosan Škoda Power will supply a steam turbine with a 70 MW generator. The delivery shall also include other systems for the turbine set. The basis of the delivery is a modern single body steam turbine with reheating and axial outlet to the air-cooled condenser,” says Tomáš Winkler, Project Manager in Doosan Skoda Power. Client is a Chinese SEPCOIII ELECTRIC POWER CONSTRUCTION CORP. which is also the main contractor for the whole project for the power plant owner and operator Samra Electric Power Company Jordan. Shipping of the constructed steam turbines and other Doosan Škoda Power supplies for the construction are scheduled to mid-2017, and the power plant is planned to be launched for commercial operation about a year later.

Flenco’s presence in the Project

Flenco is pleased to have been selected as preferred partner by Doosan Skoda Power s.r.o. to supply its auxiliary systems for this project. For further inquiries about this collaboration, you can ask your usual contact person at our Sales Department or complete and send us our contact form.

Source: www.doosanskodapower.com

main projects