Tanjung Kidurong - Malaysia

Combined-cycle power plant 400 MW

  russia

Tanjung Kidurong Project Abstract

KUCHING, 28 OCTOBER 2016, FRIDAY: State Government owned utility and energy development company, Sarawak Energy yesterday signed an agreement for the construction of the 400 MW Combined Cycle Gas Turbine (CCGT) Block at Tanjung Kidurong, Bintulu with giants General Electric (GE) and Sinohydro. Estimated to cost RM 1 billion, the project will commence at the end of November 2016 and is expected to be completed by the middle of 2019. The project will see new advanced gas turbine technology and more efficient combined cycle gas turbines replacing the existing open cycle turbines at the Tanjung Kidurong Power Station in Bintulu, Sarawak. The new CCGT Block will be built within the existing Tanjung Kidurong (Bintulu) Power Station. The project will see GE, a world leader in power generation solutions for utilities, takes the lead as the Engineering Procurement & Construction (EPC) contractor with consortium partner, Sinohydro, China’s leading power and infrastructure EPC contractor. This contract is the main package for the project, out of six packages. The contract was signed with a consortium of four companies; GE Power Solutions (Malaysia) Sdn Bhd, GE (Switzerland) GmbH, Sinohydro Corporation (M) Sdn Bhd and Sinohydro Corporation Ltd.

Flenco’s presence in the Project

Flenco is pleased to have been selected as preferred partner by General Electric (Switzerland) Gmbh to supply its auxiliary systems for this project. For further inquiries about this collaboration, you can ask your usual contact person at our Sales Department or complete and send us our contact form.

Source: www.genewsroom.com

main projects