Pulau Indah - Malaysia

Combined-cycle power plant

  russia

Pulau Indah Project Abstract

Selangor, Malaysia, March 24, 2021 – GE (NYSE: GE) today announced it has secured an order from the engineering, procurement, and construction (EPC) consortium of Posco Engineering & Construction Co. Ltd. (POSCO), Mitsubishi Corporation and PEC Powercon Sdn. Bhd. to provide power generation equipment for the 1,200 megawatts (MW) Pulau Indah Power Plant, in Selangor, Malaysia. The plant will be powered by GE’s highly efficient HA technology and it will consist of a two-block combined cycle power plant, featuring a total plant configuration that is modular and cost-effective to install, control and maintain. Additionally, for the Pulau Indah Power Plant project, GE will provide a full spectrum of services solutions for 21 years. For the Pulau Indah Power Plant, GE will provide two blocks of 600 megawatts (MW), each including a GE 9HA.01 gas turbine, an STF-D650 steam turbine, a W88 generator and a Once Through Heat Recovery Steam Generator (OT HRSG). GE’s OT HRSG technology is a key enabler in advanced water-steam cycles delivering higher combined cycle efficiency, while GE’s 9HA is the company’s flagship and most efficient 50 Hz gas turbine. The natural gas fired Pulau Indah Power Plant is targeted to achieve commercial operations in 2024.

Flenco’s presence in the Project

Flenco is pleased to have been selected as preferred partner by Ge Global Parts & Products Gmbh to supply its auxiliary systems for this project. For further inquiries about this collaboration, you can ask your usual contact person at our Sales Department or complete and send us our contact form.

Source:www.ge.com

main projects