Ciprel Expansion Project - Côte D’Ivoire

Gas power plant

  erzin

Ciprel Expansion Project Abstract

The Gas Power Plant of Ciprel is located in Vridi, on the edge of lagoon, in the town of Port-Bouet. The project consists in: (i) the expansion of the existing Ciprel natural gas-fired power plant in Côte d’Ivoire by adding 111MW steam cycle capacity to 2 x 111MW open cycle gas turbines, converting them into a combined cycle operation, and (ii) the retrofitting of two gas turbines to Dry Low NOx technology for NOx emissions reduction. The Project, expected to enhance the efficiency of the power plant by generating 25.5% more power without the use of any additional gas, has been be developed, designed, constructed and operated under a 24-year Build-Own-Operate-Transfer (“BOOT”) arrangement. The Project will sell its power to the Government of Côte d’Ivoire (GoCI) through Compagnie Ivoirienne d’Electricité (“CIE”), the private transmission and distribution company.

Flenco’s presence in the Project

Flenco is pleased to have been selected as preferred partner by GE Energy to supply its auxiliary systems for this project. For further inquiries about this collaboration, you can ask your usual contact person at our Sales Department or complete and send us our contact form.

Source: http://ifcext.ifc.org

main projects